Water Biofuel Boiler With a Total Capacity of 7.5 MW, Spare Gas Boiler With a Total Capacity of 6 MW
City |
Vinnitsa |
Type of the system |
Separate boiler room with stand-alone heat source |
Consumers |
Medical City (17 consumers, including the Regional children's hospital, Oncology center, an orphanage) |
Size of modernizations |
Comprehensive modernization. 2 new heat sources in the existing biomass boiler. |
Fuel |
Wood chips, sawdust, pellets. Gas as reserve fuel . |
Beginning of exploitation |
December 2014 |
Rated power |
7.5 MW (biomass) |
Production per year |
12 000 – 13 000 Gcal |
Since its inception, the Company 'Vintea' was aimed at the introduction of innovative technologies for the modernization of existing boilers of Vinnitsa medical and budgetary organizations. As a result of the transition from Russian gas to local biofuels the budget saved about 1.5 million UAH in 2015 with only one boiler.